OMA will collaborate with local architect Artech Inc. to build the 120,000 square foot theatre complex. The stage design is being developed with Ducks Sceno and the engineering is being provided by Arup. The centre is scheduled to be completed in 2013 with a budget of 3.8 billion Taiwan dollars (90 million Euro). The Taipei city council expects the centre to further facilitate the development of local performing groups and add to Taipei’s image as an international cultural hub.
The project is led by OMA partners Rem Koolhaas and Ole Scheeren. The competition team included associate AndrĂ© Schmidt and architects Adam Frampton and Mariano Sagasta, amongst many others. Koolhaas’s and Scheeren’s previous collaborations include the CCTV Headquarters and TVCC Cultural Centre in Beijing, as well as Prada Epicentre Stores in New York and Los Angeles.”
Source: OMA
Image obtained from: architecturelab.net
No comments:
Post a Comment